Tirana 16°EUR 90,64 L
Morning BriefingPodcastShqip·English
ANN
NewsPoliticsCrime & CourtsEconomyRegionWorldSportsCultureOpinion
In focusU.S.KosovoProtestStudent protestEdi RamaParliament

Morning Briefing

The day's top stories by email, every morning. Free.

Unsubscribe any time. How we use your data

ANN

Verified news from Albania, the region and wherever Albanians live.

The ANN appComing soon

  • App Store
  • Google Play

News

  • News
  • Politics
  • Crime & Courts
  • Economy
  • World

Region

  • Kosovo
  • North Macedonia
  • Montenegro
  • Presevo Valley
  • Diaspora

More

  • Sports
  • Culture
  • Opinion
  • Weather
  • Exchange rates

Read & listen

  • Morning Briefing
  • Podcast
  • Archive
© 2026 ANN · Albanian News Network
  • Privacy
  • Cookies
  • Terms of use
  • Comment guidelines
  • Editorial standards
  • About us
Shqip·English

Photos: ATSH, Wikimedia Commons and official sources, as credited on each photo.

Home/Economy/Business

Business

Kelmend residents and two environmental groups sue the state over hydropower plants in Vukël

The lawsuit at the Tirana Administrative Court seeks to halt construction and annul the “Ura e Tamarës” concession and the permits for the existing Vukël hydropower plant.

AN

By ANN Newsroom · Newsroom

October 20, 2026, 15:51 · Updated 12:22 · 2 min read

0
View of the village of Vukël in Kelmend, amid the mountains of the Albanian Alps
The village of Vukël in Kelmend, where residents oppose the construction of hydropower plants (file photo)Photo: Sigismund von Dobschütz / Wikimedia Commons, CC BY-SA 3.0

In brief

  • Five residents of Vukël and Kozhnjë, together with the LUMI Center and the “Well-Point” association, have filed suit against five state institutions.
  • They are seeking an immediate halt to construction and the annulment of the concession contract and environmental permits.
  • The concession approved in 2019 provides for three hydropower plants on the same river, with a combined capacity of about 15 MW.

Five residents of the villages of Vukël and Kozhnjë in Kelmend, together with the environmental organizations LUMI Center and the “Well-Point” association, have taken the hydropower projects on the Vukël River, in the Cem basin, to the Tirana Administrative Court of First Instance. The lawsuit was filed on Monday and made public by BIRN.

The defendants are the Ministry of Infrastructure and Energy, the National Environment Agency, the National Territorial and Water Council, the National Agency of Protected Areas and the Malësi e Madhe municipality. Tamara Hydro Energy, the concession holder, and WTS Energji, which holds the permits for the existing Vukël hydropower plant, have been named as third parties.

What the concession provides

The “Ura e Tamarës” concession, first approved in 2019, includes three hydropower plants on the same river: Kozhnja 1 at 1.9 MW, Kozhnja 2 at 1 MW and Tamara at about 12.1 MW. The contract was amended in February 2025, extending the deadlines for obtaining the necessary permits. The plaintiffs are also challenging a 2010 authorization and a 2013 water-use permit for the existing plant.

According to them, work has begun on the ground, but residents have not been fully informed about its nature, the mandatory information sign is missing and requests for documents have gone largely unanswered. It is not clear whether the Vukël plant is being rebuilt or whether the three new plants are being started.

The plaintiffs' arguments

The plaintiffs argue that there was no real consultation with the community and that the environmental impact assessment did not measure the combined effect of the three plants on the river, biodiversity and the villages' water supply. The river rises in the Albanian Alps National Park and is a habitat of the marble trout, an endangered species. They also raise the lack of cross-border consultation with Montenegro, as the Cem flows toward the Moraça and Lake Shkodra.

“Our homes” are at risk, said Niko Gjelaj, one of the plaintiffs from Vukël, while LUMI director Besjana Guri described the lawsuit as a critical step toward protecting the upper course of the Cem.

Hydropower plantsKelmendEnvironmentConcessionsEnergy
ANANN NewsroomNewsroom

More from Economy

ANN

Business

September brings 1,985 new businesses: trade and tourism lead, one in three run by a woman

October 22, 08:30

ANN

Business

Businesses required to obtain a certificate for their NVE code; financial statements only via e-Albania

October 21, 17:30

ANN

Jobs

Ibrahimaj: 60 million euros for the Youth Guarantee, aiming to get 10,000 young people into jobs in 2027

October 21, 16:30

Most read

  1. 1Ocasio-Cortez and Ritchie Torres condemn violence against protesters in Albania: De-escalate
  2. 2Chaos in Parliament: Noka grabs Balla's microphone, PD blocks the podium and PS votes bills by show of cards
  3. 3“Don't touch the students!”: Lecturers march on Parliament as medical students join the protest
  4. 4Day 9 of the protest: Molotov cocktails at the Prime Minister's Office and burned chairs, but the evening passes without major clashes
  5. 5Klosi: Socialists choose their own leader; Rama will win the next two elections too

Read next

All news
Official portrait of Rep. Alexandria Ocasio-Cortez

Diplomacy

Ocasio-Cortez and Ritchie Torres condemn violence against protesters in Albania: De-escalate

October 22, 11:24

Prime Minister Edi Rama shakes hands with Montenegrin Prime Minister Milojko Spajić in front of a Berlin Process backdrop

Diplomacy

Rama at the Berlin Process summit in Budva; Merz: Don't pour gasoline on the fire of the past

October 22, 11:22

Opposition and majority lawmakers crowded in front of the podium in the parliamentary chamber, with overturned chairs in the foreground

Parliament

Chaos in Parliament: Noka grabs Balla's microphone, PD blocks the podium and PS votes bills by show of cards

October 22, 11:17

Comments 0

?
0/600

By posting you accept our comment guidelines · privacy

Comments are moderated. Insults, spam and links are held for review.

No comments yet. Be the first to comment.